Detailed, comprehensive analysis of energy markets — from the decades-long expansion plan to the hourly operation of highly decarbonized systems.

The platform

One place for the whole power system analysis

AMEBA brings together mathematical models for different challenges in the energy sector, all on a single database: internally, the data adapts to the time configuration the user defines.

Users define the horizon and the granularity of the solution, and run simulations from any computer — no installation, no limit on parallelism.

One single databaseINVXExpansion planningCHTHydrothermal coordinationUCShort-term planningMaxHidroRiver basin operation
One single databaseINVXExpansion planningCHTHydrothermal coordinationUCShort-term planningMaxHidroRiver basin operation
4
models on a single database
Hourly
resolution over annual horizons
Cloud
parallel simulations, no limit
0
installs: everything in the browser

Capabilities

What makes AMEBA different

AMEBA's capabilities make the platform useful across many areas of the energy sector.

Single database

All models work on a single database; the data adapts itself to the time configuration the user defines.

Multiple modules

A range of mathematical models for different challenges in the energy sector.

Flexibility

Users define the study horizon and the granularity of the solution.

Uncertainty

Uncertainty at several levels: hydrology, demand, fuel prices, line capacity.

Web-oriented

Simulations run and display from any computer, with hassle-free updates.

Visualization

Easy-to-use interface. Every module includes an interactive results summary.

Compute-intensive

Cloud computing, no limit on parallel simulations. Faster analysis.

Model extension

Creating and extending models is easy, and predefined formulations can be inherited.

Agile development

Agile development, with constant updates driven by what our clients need.

Who uses AMEBA

ConsultantsGeneration companiesGrid operatorsRegulatorsNational Energy CommissionPrice forecasting agenciesTrade associationsUniversities and research centres

Horizons

A model for every time scale

The four modules span from the intraday operation of a single plant to a decades-long expansion plan, and chain together to gain granularity.

HoursDaysWeeksMonthsYears
River basin operationShort-term planningHydrothermal coordinationExpansion planning

Click a bar to jump to that module

Uncertainty at multiple levels

Scenarios combine inflows, wind and solar generation, demand and fuel prices. The tree is configured per stage: branches open at different points of the horizon.

Stage tt+1t+2t+3Scenario tree
Stage tt+1t+2t+3Scenario tree

Modules

The four models inside AMEBA

Each module answers a different question, on the same database and through the same interface.

Generation & Transmission planning

INVX

Determines the system's optimal investment plan.

It serves both tariff studies and forward-looking projections of how the generation mix will evolve, and targets planners in centralized decision-making, regulators seeking efficient energy policy and investors in competitive markets.

You control simulation precision through intuitive characterization tools. It supports stochastic problems for robust decisions under hydrological uncertainty, demand variations and fuel prices, and solves with MIP techniques or Benders decomposition.

Used by Chile's Ministry of Energy in its Long-Term Energy Planning process between 2018 and 2025.

202520302035204020452050Installed capacity [GW]ThermalHydroWindSolarStorage
202520302035204020452050Installed capacity [GW]ThermalHydroWindSolarStorage
Installed capacity by technology under the optimal plan.
Summary
Generation costs
1,529.0MMUSD
Start/stop costs
0.21MMUSD
Generation investment
13,860.0MMUSD
Transmission investment
23.05MMUSD
CO₂ tax costs
39.31MMUSD
Unserved energy cost
39.08MMUSD
Total costs
15,500.0MMUSD

Average expansion cost
4.44USD/MWh
CO₂ emissions
8.22MMTon
CO₂ system factor
0.021TonCO₂/MWh

Candidate technologies

  • Thermal plants
  • Hydro plants (on river networks)
  • Wind, photovoltaic and CSP plants
  • Storage systems
  • Up-powering at reservoir plants

Modelling

  • Investment and operating costs vary over time
  • Generation projects can be sized (integer or continuous)
  • Forced projects can be included
  • AC and/or DC candidate transmission lines

It is also possible to represent

  • Fuel availability constraints
  • Capacity payments or CO₂ emission charges
  • Separate definition of 'policy' and 'hydrological' scenarios
  • Renewable energy targets (quota system)
  • Environmental constraints
Hydrothermal Coordination

CHT

Finds the least-cost operating policy for the hydrothermal system.

It respects the operational constraints of both the power system and the river basins, and also computes economic indicators: the price of dispatched energy at each bus and the value of water.

The reservoir model includes spills and seepage, which removes spillage penalties and fictitious inflows. It allows multiple water paths and turbine-by-turbine detail.

Aflu_UpperinflowEmb_UpperfiltratedspilledreleasedHHG_UpperturbinatedAflu_SideinflowEmb_CompensationirrigationreleasedNodewaterwayHHG_RunOfRiver
Aflu_UpperinflowEmb_UpperfiltratedspilledreleasedHHG_UpperturbinatedAflu_SideinflowEmb_CompensationirrigationreleasedNodewaterwayHHG_RunOfRiver
Every water path carries its type: turbinated, spilled, filtrated, released, irrigation. That is how the basin is modelled in AMEBA.
Element parameters
Hydro type
Turbinated
Max Q flow
120m³/s
Min flow
8m³/s

Delay
45min
HC penalty
0USD/m³/s

Key features

  • Derives the water usage policy (target reservoir volumes) or future cost functions
  • Load duration curve and stage-block structure for short-term demand variation
  • Stage-block structure for correct peak-shaping at reservoir plants
  • Day/night block separation
  • Flexible implementation with no maximum number of stages or blocks

Also

  • Numerically stable model
  • Flexible horizon, combining hydrological scenarios with other stochastic variables (fuels, renewables, demand)
  • Chaining of the long-/medium-term solution with a short-term model to gain granularity
  • Pumping can be included

Decomposition algorithms

CHT is a large-scale multi-stage stochastic problem: it has to be split into subproblems whose solutions are then coordinated. In AMEBA you choose between two algorithms:

SDDP

Classic parallel decomposition: it uses as many CPUs as the problem has scenarios, also to formulate, process data and write results. It includes several ways of modeling reduced uncertainty (snowmelt) and future cost functions.

Progressive Hedging

Brings short-term aspects — technical minimums, minimum operating times, spinning reserves — into the strategic use of water. It represents non-convexities SDDP does not cover: varying efficiencies, piecewise concave functions and binary irrigation rules.

Short-term planning

UC

Determines the short-term operation of the hydrothermal system, hour by hour.

It targets detailed studies of price signals and operational aspects: operating constraints, line usage, reserve allocation. It characterizes the generation fleet and the river basin networks in detail.

Through rolling planning, it characterizes operation at hourly resolution over annual horizons in a matter of hours.

0006121823Generation [MW] and marginal costThermalWindSolarStorageMarginal costdrag to narrow the range
0006121823Generation [MW] and marginal costThermalWindSolarStorageMarginal costdrag to narrow the range
Hourly dispatch by technology and the resulting marginal cost signal.

Formulation features

  • Mixed-integer, multi-reservoir, multi-stage and multi-nodal model
  • Minimum and maximum output levels
  • Spinning reserve (primary-secondary) and standing reserve for different control areas
  • Minimum up and down times
  • Start-up and shut-down costs; ramp-up and ramp-down rates
  • Fuel availability constraints
  • Ability to co-optimize energy and reserve markets

Technologies represented

  • Conventional thermal units
  • Natural gas combined cycles (2+1, 3+1)
  • Storage systems and pumped-storage plants
  • CSP
  • Renewables: wind, photovoltaic and others

Flexibility and efficiency

  • The stochastic model does not formulate non-anticipativity: faster solutions
  • Relaxation of unit commitment for faster convergence
  • Constraints can easily be enabled or disabled in the formulation
Short-term operation support tool

MaxHidro

Guides operator decisions so that peak-shaping is optimized.

The operator of a plant within a river basin network tends to decide conservatively and cannot exploit the plants' flexibility to maximize revenue. The solution guides those decisions so peak-shaping is optimized during operation.

Peak0006121823Energy pricePlant generation
Peak0006121823Energy pricePlant generation
Generation concentrates in the highest-price hours: that is peak-shaping.

Benefits

  • Higher revenues and increased energy sales
  • More efficient process and operational simplicity
  • Better use of water resources
  • Dispatch guidance for plant operators

Formulation features

  • Price-taker model
  • Hydraulic network in detail: time delays, environmental flow, irrigation returns and water hammer
  • Complex topologies (canals, extractions and others)
  • Represents the efficiency curve of each turbine
  • Unit commitment constraints

In the cloud

AMEBA in your browser: anywhere!

Use AMEBA from your browser, on any device, anywhere. Cloud servers allow more detailed studies and more scenarios, in less time and at lower cost.

The case manager organizes simulations, simplifies comparison between studies and records the latest changes in a shared log.

Case managerStudy comparisonChange logSimulation queue
ameba.spec.cl

Immediate access, no installation

Lower update adoption costs for users.

Collaborative

Share case studies and distribute results; it supports mobility and remote work.

Faster onboarding

Continuous updates to the interface and the computation engine, hassle-free.

Use PLP with AMEBA

AMEBA integrates the PLP model used by the National Electrical Coordinator to determine the strategic value of water. Bring your own license and run it with the full platform: interface, cloud computing and results analysis.

More capabilities

And many more features…

We keep adding options to the platform, driven by what our clients ask us to build in.

Advanced visualizations

Display the electrical and river networks, with views by voltage level, generation technology and other criteria.

Free automatic updates

Immediate access, no installation. Interface and computation engine improve continuously.

Team-oriented

Share case studies and distribute results across multiple platforms. It supports mobility and remote work.

Remote supportBulk data uploadMultiple solversAutomated reportsMulti platformRemote access

Plans

A configuration for every team

AMEBA is configured to what each client needs. The cloud server runs simulations on elastic infrastructure, with several configuration options, all prepaid.

Plan S

Clients seeking to improve the operation of their river basin.

Optimization horizon
1-5 days
Models
MaxHidro
Users
1 user
Compute server
Cloud
Plan L

Companies and consultants with collaborative teams that may or may not have their own equipment for solving optimization problems.

Optimization horizon
Weeks - Years
Models
MaxHidroUCCHTINVX
Users
More than 2 users
Compute server
Cloud or at client premises

It is cost-efficient and scalable: it solves complex problems within tolerable run times, improves compute server availability, avoids external interruptions and increases system security.

Main supported solvers: Gurobi · FICO Xpress · IBM CPLEX · COIN-OR

Cost control

Keep control of your spending!

An interactive platform to transparently track what using AMEBA costs: the actions executed, the cost of each simulation and the running total.

TransparentInteractive and easy to useEnables real-time collaborationMore efficient training
SERVER STATS64 vCPU · 512 GiB%0255075100CPUMemoryNetworklast 24 h0006121824
SERVER STATS64 vCPU · 512 GiB%0255075100CPUMemoryNetworklast 24 h0006121824
Period costs
Compute server
52%
Case storage
31%
Solver licenses
17%

Simulations run
128
Compute hours
412h

Shall we talk about your case?

Tell us what you need to analyze and we will show you how AMEBA solves it, with a demo on your own data.

← Back to Simulation Tools